Components COMPONENTS ILLUSTRATION
Inspection INSPECTION PROCEDURE 1. INSPECT NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
(b) Check the No. 1 vacuum switching valve assembly (for ACIS) operation.
Installation INSTALLATION PROCEDURE 1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS) (a) Install the No. 1 vacuum switching valve assembly (for ACIS) to the intake air surge tank assembly with the bolt. Torque: 9.0 N·m {92 kgf·cm, 80 in·lbf} (b) Connect the 2 vacuum hose sub-assemblies to the No. 1 vacuum switching valve assembly (for ACIS). (c) Connect the No. 1 vacuum switching valve assembly (for ACIS) connector. 2. INSTALL V-BANK COVER SUB-ASSEMBLY Click here Removal REMOVAL PROCEDURE 1. REMOVE V-BANK COVER SUB-ASSEMBLY Click here 2. REMOVE NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
(b) Disconnect the 2 vacuum hose assemblies from the No. 1 vacuum switching valve assembly (for ACIS).
|
Toyota Avalon (XX50) 2019-2022 Service & Repair Manual > Fuel Pressure Sensor(for High Pressure): Components
COMPONENTS ILLUSTRATION *1 FUEL PRESSURE SENSOR (FUEL DELIVERY PIPE WITH SENSOR ASSEMBLY LH) *2 FUEL PIPE PLUG SUB-ASSEMBLY *3 DUST CAP SUB-ASSEMBLY *4 O-RING *5 NO. 1 FUEL INJECTOR BACK-UP RING *6 NO. 2 FUEL INJECTOR BACK-UP RING *7 NO. 3 FUEL INJECTOR BACK-UP RING *8 GASKET Tightening torque for " ...