INSTALLATION PROCEDURE 1. INSTALL HYBRID BATTERY THERMISTOR CAUTION: Be sure to wear insulated gloves and protective goggles.
(c) Connect the battery voltage sensor connector. (d) Engage the clamp.
(f) Engage the clamp. 2. INSTALL NO. 1 HV BATTERY INTAKE DUCT LH CAUTION: Be sure to wear insulated gloves and protective goggles. (a) Install the No. 1 HV battery intake duct LH to the HV battery with the clip. (b) Engage the claw of hybrid battery thermistor (sensor portion) to connect the hybrid battery thermistor to the No. 1 HV battery intake duct LH. 3. INSTALL NO. 2 HYBRID BATTERY SHIELD SUB-ASSEMBLY CAUTION: Be sure to wear insulated gloves and protective goggles. (a) Pull back the rear No. 1 HV battery shield and install the No. 2 hybrid battery shield sub-assembly to the HV battery. HINT: Pull back the rear No. 1 HV battery shield until there is sufficient clearance for the stud bolt of the No. 2 hybrid battery shield sub-assembly. (b) Install the 5 nuts. Torque: 7.5 N·m {76 kgf·cm, 66 in·lbf} 4. INSTALL HV BATTERY JUNCTION BLOCK ASSEMBLY Click here 5. INSTALL UPPER HV BATTERY COVER SUB-ASSEMBLY Click here 6. INSTALL HV BATTERY Click here |
Toyota Avalon (XX50) 2019-2022 Service & Repair Manual > Inside Handle Light: Inspection
INSPECTION PROCEDURE 1. INSPECT FRONT DOOR INSIDE HANDLE ILLUMINATION LIGHT ASSEMBLY LH (a) Apply auxiliary battery voltage to the front door inside handle illumination light assembly LH and check that the lights illuminate. OK: Measurement Condition Specified Condition Auxiliary battery positive (+ ...