ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY (a) Check Rotation Direction Signal: (1) Connect the Techstream to the DLC3. (2) Turn the power switch on (IG). (3) Turn the Techstream on. (4) Enter the following menus: Powertrain / Engine / Data List / VVT-iE Motor Direction Bank1. Powertrain > Engine > Data List
(5) According to the display on the Techstream, read the Data List. Specified Condition:
HINT: If the result is not as specified, inspect the cam timing control motor with EDU assembly and wire harness. (b) Check VVT Change Angle: (1) Connect the Techstream to the DLC3. (2) Turn the power switch on (IG). (3) Turn the Techstream on. (4) Put the engine in Inspection Mode (Maintenance Mode). Powertrain > Hybrid Control > Utility
(5) Start the engine and warm it up until the engine coolant temperature reaches 75°C (167°F) or higher. (6) Enter the following menus: Powertrain / Engine / Active Test / Control the VVT-iE Opening Angle Bank 1 / Data List / Intake VVT Change Angle Bank 1 and Intake VVT Target Angle Bank 1. Powertrain > Engine > Active Test
(7) Read the Data List while performing the Active Test with the engine idling. Specified Condition:
HINT: If the result is not as specified, inspect the cam timing control motor with EDU assembly and camshaft timing gear assembly. |
Toyota Avalon Service & Repair Manual > Lighting System(for Hv Model With Cornering Light): Open in IG Circuit (B242E)
DESCRIPTION The headlight ECU sub-assembly operates using the power source voltage input from the IG terminal and ECUB terminal. The IG terminal power source voltage is supplied by turning the IG1-NO. 1 relay to ON. The headlight ECU sub-assembly receives power switch on (IG) signals from the main b ...