INSTALLATION PROCEDURE 1. INSTALL VACUUM SWITCHING VALVE (for Active Control Engine Mount System) (a) Install the vacuum switching valve (for active control engine mount system) to the front engine mounting insulator with the nut. Torque: 6.0 N·m {61 kgf·cm, 53 in·lbf} (b) Connect the 3 vacuum hoses to the vacuum switching valve (for active control engine mount system). (c) Engage the wire harness clamp and connect the vacuum switching valve (for active control engine mount system) connector. (d) Install the 2 bolts. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} (e) Engage the wire harness clamp and install the engine wire with the bolt. Torque: 8.0 N·m {82 kgf·cm, 71 in·lbf} 2. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE Click here 3. INSTALL INLET AIR CLEANER ASSEMBLY Click here 4. INSTALL COOL AIR INTAKE DUCT SEAL Click here |
Toyota Avalon Service & Repair Manual > Oil Pump: Reassembly
REASSEMBLY PROCEDURE 1. INSTALL OIL PUMP ROTOR SET (a) Coat the drive rotor and driven rotor with engine oil and place them into the timing chain cover assembly with the rotor marks facing up. Check that the rotors rotate smoothly. *a Rotor Mark 2. INSTALL OIL PUMP COVER (a) Install the oil pump cov ...