INSTALLATION PROCEDURE 1. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY
(b) Using a 24 mm deep socket wrench, install the engine oil pressure switch assembly. Torque: 15 N·m {153 kgf·cm, 11 ft·lbf} NOTICE: Do not start the engine for at least 1 hour after installation. (c) Connect the engine oil pressure switch assembly connector. (d) Engage the clamp to connect the wire harness protector. 2. ADD ENGINE OIL Click here 3. CHECK ENGINE OIL LEVEL Click here 4. INSPECT FOR OIL LEAK Click here 5. INSTALL FRONT FENDER APRON SEAL RH Click here |
Toyota Avalon Service & Repair Manual > Front Door Lock: Removal
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during front door lock with motor assembly removal/installation are shown below. Necessary Procedure After Par ...